Download Calgary’s secondary suite load worksheet
Download the City of Calgary load calculation worksheet from the City's secondary suite guidance. Check the current form and submission requirements for your permit. The worksheet documents the calculation; it does not replace a permit or the rest of a project's design information.
The secondary suite process asks for the calculation before electrical rough-in. Other projects, including EV charging with an energy management system, can have different requirements. Use the City's electrical permit guidance for the relevant project type.
Complete the fields in order
Project address and permit numbers
Identify the main dwelling and each suite, using the correct addresses and electrical permit numbers. Check that these match the permit records and project drawings.
Dwelling areas
Enter area in square metres. To convert square feet, divide by 10.764: for example, 1,200 ft² is about 111.5 m². Identify above-ground and basement areas separately, and confirm which area is included under the applicable rule.
Basic area load
| Living area | Basic load |
|---|---|
| First 90 m² | 5,000 W |
| Each additional 90 m², or portion of it | 1,000 W |
For example, 95 m² of applicable living area gives a 6,000 W basic area load. The extra 5 m² starts another block; it is not prorated. This is one component of the calculation, not the total service requirement.
Heating and cooling
Record the equipment ratings. If a non-simultaneous allowance is used, confirm that the installation meets its conditions. Do not assume heating and cooling cannot operate together merely because they are usually used in different seasons.
Ranges and water heating
Include each dwelling's range. Identify water heaters as storage-tank or tankless, because their demand treatment differs. Use the equipment nameplates and the worksheet's categories.
EV charging, pools, hot tubs and spas
Record the relevant equipment ratings in their designated rows. Where an EVEMS is proposed, check the City's current equipment and submission requirements separately. Do not manually reduce the charger rating without an applicable basis.
Additional fixed loads
List other applicable fixed loads, such as dryers and storage-tank water heaters. Do not count equipment here if it has already been included in heating, cooling, EV charging or another dedicated category. Apply the relevant demand treatment rather than one percentage to every appliance.
Totals, breaker and conductors
Check the calculated watts and amps, then the service breaker and conductor entries. Record the actual or proposed service accurately. A calculator's suggested size should not be copied into an existing-service field without verification.
The worksheet lists 100 A for a single dwelling with at least 80 m² excluding basement, and 60 A below that area. Check how these provisions apply alongside calculated demand and the proposed supply arrangement.
Declaration and signature
The City’s secondary suite worksheet asks for the electrical master’s name, licence number and signature. Calgary’s homeowner permit rules require a qualified electrician to complete the load calculation.
Estimate home and suite loads for the Calgary worksheet
What to check before submitting the City worksheet
| Check | What to compare |
|---|---|
| Form version and project details | The current City worksheet, addresses and permit numbers. |
| Area units | Square metres, with the correct included floor areas. |
| Equipment | Nameplates and drawings for every dwelling and planned addition. |
| Demand assumptions | Range, heating/cooling and any load-management treatment. |
| Service details | The breaker and conductor information for the actual or proposed service. |
| Declaration | The signature and identification requested by the form and permit process. |
If the work requires a service change, confirm utility capacity and the connection process early. The load worksheet does not reserve utility capacity or authorise the service change.
Frequently asked questions
Where do I get the City of Calgary load calculation form?
Download the current worksheet from the City and check the submission instructions for your project.
When does the secondary suite calculation have to be submitted?
Calgary asks for it before the electrical rough-in inspection. Prepare it earlier so any capacity or documentation issues can be addressed.
Is this form required for every electrical permit?
No single requirement covers every project. Check the City electrical permit guidance for the type of work and any energy management system involved.
Is the exported Calgary worksheet ready to submit?
Use the export as a draft. A qualified electrician completes the calculation for a homeowner permit. Check the equipment, drawings and permit details, then arrange the required declaration and signature before submitting the worksheet.
Need a signed worksheet for your permit? Request a signed residential load calculation.
Planning information only. Confirm the calculation, equipment and current submission requirements for your project. Final acceptance rests with the authority having jurisdiction.